More Projects

ISOLUX Power Project


Our Role

SMEC, as Owner's Engineer, was engaged by ISOLUX to provide project management and construction supervision of the 765 KVS/C Mainpuri-Bara Line with 765/400 AIS at Mainpuri and associated schemes/works.

SMEC's services include project management supervision for installation, testing, commissioning and progress monitoring.

Project Overview

The objective of this project is to transmit power from several power stations and strengthen the power grid in Uttar Pradesh.

This project includes the construction of 13 transmission lines (400 kV and 756 kV) with a total length of 1,500 km, three Air Insulated Substations (AIS) and two Gas Insulated Substations (GIS).

Location:
India
Technical Area:
Energy
Client:
ISOLUX


Learn More

To learn more about our Transmission & Distribution capabilities please fill out the form below and one of our team will be in touch.