More Projects

Sibundong Hydroelectric Power Project



Our Role

SMEC was engaged to prepare a feasibility study, provide basic design and complete tender documents for the project.

SMEC’s scope of work included:

  • Review of pre-feasibility study
  • Management and supervision of investigation works
  • Preparation of feasibility study
  • Preparation of terms of reference for the Environment Social Impact Assessment and Environmental Impact Analysis.

Project Overview

PT. Tapanuli Hydro Energy (Tapanuli) plan to develop a 60 MW run-of-river Hydroelectric Power Project located on the Sibundong River in the Tapanuli Regency of North Sumatra.

The project is being developed under an Engineering Procurement Construction (EPC) form of contract.

Project scope included: site surveys; geotechnical site investigations; feasibility level design; and financial and economic analysis to enable Tapanuli to obtain funding and enter into negotiations for a power purchase agreement.

Location:
Indonesia
Technical Area:
Energy
Client:
PT. Tapanuli Hydro Energy


Learn More

To learn more about our Hydropower & Dams capabilities please fill out the form below and one of our team will be in touch.