Urban Development

By combining the skills and expertise from across the Surbana Jurong Group, SMEC South Africa plans and delivers liveable and sustainable urban spaces and communities.

We undertake an integrated planning approach on all projects and draw on our expertise across a range of disciplines to create holistic urban spaces.

Our urban planning services span a wide range of market sectors including: residential, industrial and commercial; education, health and aged care; sports and culture; and urban regeneration.

Our planners have expert knowledge of government legislation and planning provisions and long established relationships with key stakeholders and decision makers in the planning and approvals process. This knowledge adds significant value to our clients and their projects.

Our services

  • Preliminary ‘desktop’ planning review and advice
  • Planning advisory services
  • Land use planning
  • Approval pathway mapping
  • Planning legislation amendments and development approval
  • Growth area and settlement structure planning
  • Community and stakeholder consultation
“Our clients benefit from our urban planning expertise, provided as both a stand-alone and an integrated service delivery model, including urban and landscape design and engineering services.”
– Dave Duke, General Manager, Social & Urban Development Africa
#
#

Royal Bafokeng Sports Palace

The project timeframe was extremely tight for the concept, preliminary and detail design. The detailed design took approximately one year, and practical completion was achieved the day before the first game was played on March 28, 2009.

SMEC utilised a range of technologies in design and execution, with many firsts compared to other stadia. The composite steel and concrete structure won an award for technical excellence from the South African Institute for Steel Construction in 2009. Learn more

#
More Projects Zimbali Lakes Golf Estate

The first phase of the project consists of all bulk infrastructure required to service the full estate and also to include the Lifestyle Villages. The project scope includes the design of all bulk infrastructure (water, sewer, stormwater, roads, 5ML reservoir, an earth dam, sewer pump stations, pipe bridges and all bulk earthworks. The construction will be rolled out over the next five years. The current phase is expected to be completed in 16 months.

The viaducts are constructed using the Incremental Launch Method to accommodate traffic and elevation constraints. Learn more

#
Cornubia

SMEC was engaged to provide the planning, preliminary and detailed design of the bulk infrastructure for all bulk earthworks, road access, stormwater systems, sanitation, irrigation and water supply.

Cornubia Precinct was awarded the Best Priority Project at the 2013 Govan Mbeki Awards. The purpose of the Govan Mbeki Awards is to promote and instil a culture of excellence in the delivery of quality human settlements in South Africa. Learn more