The Mawa-Bhanga section of the Padma Bridge Rail Link is the most important section of the project, as it connects the two banks of the Padma River.
SMEC and ACE were appointed as consultants for the feasibility and concept design stages. SMEC and ACE were also involved during the implementation phase as a sub-consultant to the Bangladesh Army who was appointed as the Construction Supervision Consultant (CSC).