Applying new methodology to hydropeaking and aquatic baseline study


The project

The government of Germany is supporting the government of Vietnam in strengthening its power sector, with emphasis on the utilisation of renewable energy. Vietnam has considerable potential for hydropower. The cooperation of the two countries in the energy sector is implemented through collaboration between Kreditanstalt fur Wiederaufbau (KfW) and Electricity of Vietnam (EVN).

The Tri-An Hydro Electric Power Project is located in South Vietnam on the Dong Nai River, and will be operated as peak generator. Hydropeaking implicates particular environmental issues, which have not been considered in the existing Environmental Impact Assessment. Potential downstream effects are related to water quality, fluvial geomorphology and dominant geomorphic processes. High shear stresses due to rapidly rising water levels are associated with faunal displacement and possibly bed movement under rapidly varying flows, effects on riparian vegetation, downstream effects on macroinvertebrates, on reproduction sites and feeding grounds of native fish species; downstream effects on habitat quality and inundation pattern of shallow floodplain habitats used by water birds for nesting, foraging and nesting, and downstream flooding of land.

The challenge

SMEC has been engaged to prepare a hydropeaking and aquatic baseline study on the project, including identifying impacted species and analysing related environmental risks for the project.


The solution

Through literature review, desktop review of available documents and field surveys, our team of local and international specialists have been conducting a thorough and delicate study of different aquatic habitats and for different species groups, based on sound international practice. Our role includes developing a specific methodology to identify the impacts on the aquatic environment, including the modelling approaches that will be utilized to identify future impacts to the extension of the hydropower plant (habitat alterations).

Based on the results, we will identify all environmental and social impacts due to hydropeaking, including mitigation scenarios and measures if required. This analysis forms an essential part of the feasibility study for the project.

Location:
Dong Nai Province, Vietnam
Technical Area:
Hydropower, Hydropeaking and Aquatic Baseline Study
Client:
KFW