Experienced Engineer - Geotechnics

Rani is a Geotechnical Engineer in the SMEC Melbourne team with 6 years of experience. She has been seconded to Snowy Hydro Owner’s Team since 2021: as a geotechnical engineer working closely with the technical and GBR (Geotechnical Baseline Report) team (2021-2023), site geotechnical engineer working in the construction team (2023 – ongoing).  

 

Rani has been involved in large scale infrastructure projects across Australia namely Snowy Hydropower Scheme 2.0, Rail Level Crossing Removal – Mentone, West Gate Tunnel Proof Engineering and Melbourne Airport T4 Express Link.